Recently, the Wuhan Phase III main plant of CALB's Wuhan project was successfully topped out and the core production line of the Wuhan Phase II plant was also successfully completed ahead of schedule. The battery products from this production line are advanced lithium-iron products, which are developed by CALB with a new material system. It is also the first time for our company to apply the tab direct connection structure. As a result, the battery is long-lasting, efficient, safe and lightweight.
Jiangsu | No. 1, Jiangdong Avenue, Jintan District, Changzhou
European (Portugal) | Avenue Infante Santo, number 43, 3rd floor, 1350-177 Lisbon, Portugal